
The logo of Gazprom company is seen at the St. Petersburg International Economic Forum (SPIEF) in Saint Petersburg, Russia, June 2, 2021. REUTERS/Evgenia Novozhenina
MOSCOW, Dec 24 (Reuters) – The board of Russia’s Gazprom has approved signing a memorandum with Linde (LIN.N), and RusKhimAlyans to build a third line at a liquefied natural gas (LNG) plant at the Baltic Sea port of Ust-Luga, Gazprom said on Friday.
The LNG plant is a part of a gas chemical complex that will include a plant with annual capacity to process 45 billion cubic metres of gas and a 13 million tonnes per year LNG plant. The complex is expected to start production in 2024-2025.
Register now for FREE unlimited access to Reuters.com
Reporting by Vladimir Soldatkin and Oksana Kobzeva; Editing by Edmund Blair
Our Standards: The Thomson Reuters Trust Principles.
The logo of Gazprom company is seen at the St. Petersburg International Economic Forum (SPIEF) in Saint Petersburg, Russia, June 2, 2021. REUTERS/Evgenia NovozheninaMOSCOW, Dec 24 (Reuters) – The board of Russia’s Gazprom has approved signing a memorandum with Linde (LIN.N), and RusKhimAlyans to build a third line at a liquefied natural gas (LNG) plant at the Baltic Sea port of Ust-Luga, Gazprom said on Friday.The LNG plant is a part of a gas chemical complex that will include a plant with annual capacity to process 45 billion cubic metres of gas and a 13 million tonnes per year LNG plant. The complex is expected to start production in 2024-2025.Register now for FREE unlimited access to Reuters.comReporting by Vladimir Soldatkin and Oksana Kobzeva; Editing by Edmund BlairOur Standards: The Thomson Reuters Trust Principles.
